Completed projects

A selection of completed projects is shown below illustrating the levels of investment the University of York has made over the last decade. The past, present and future developments have remained true to our original master plan principles and will continue to do so.

table banner for retail dev on Hes East

Retail development 

  • Opened in early 2018 
  • The new development brings a medical centre and shops to Campus East

Wolfson Atmospheric Chemistry Laboratories (WACL) extension

  • Extension to the WACL building, immediately east of the YPI building
  • Accommodating new laboratories and open-plan office space

Piazza Building

  • Opened in January 2018
  • Teaching rooms, catering and kitchen areas and domestic and social spaces for Campus East

Spring Lane Building

  • Completed in September 2016
  • A new cross-departmental teaching and learning centre, featuring a 350-seat lecture theatre, seminar rooms, study and informal meeting areas.
 

Biology Phase 2

  • Opened in September 2016
  • Three-storey teaching and lab facility
  • £5m HEFCE STEM award

Athletics track pavilion and stand

  • Completed in April 2016
  • A pavilion and spectator stand for the new athletics track

 

York Plasma Institute extension
  • Extension to the Genesis 1 and 2 building
  • Home of the EPSRC Fusion Centre for Doctoral Training
Credit: Dave Rippin

Environment Building

  • Completed December 2015
  • The building houses the Department of Environment and Geography, the Stockholm Environmental Institute York, the York Environmental Sustainability Institute, and the BioArCh research group
Vanbrugh substation elevation (Crown Copyright)

Vanbrugh and Wentworth substations

  • Completed in summer 2015
  • New substations to increase capacity and maintainability
Athletics Track
  • Completed June 2015
  • A new county-standard athletics facility
BioMed image Biomedical Sciences Building
  • Opened December 2014 by Government Chief Scientific Advisor Sir Mark Walport
  • The first part of a phased redevelopment of Biology
 college nine table image

Constantine College

  • Our youngest College welcomed its first students in October 2014
‌‌ Open-access basketball court
  • Opened October 2014
  • Between Langwith and Constantine colleges
 

Teaching cabins

  • Two temporary teaching cabins for use until the new teaching building is completed
  • James blocks P and Q
‌‌list-banner-velodrome-aerial

Olympic-size Velodrome

  • £1.1m outdoor tarmac velodrome
  • Opened Summer 2014 to coincide with Le Grand Départ

Awards:

  • Smeaton Award Certificate of Excellence 2015
  • Shortlisted RICS Tourism and Leisure 2015

Chemistry: new undergraduate teaching laboratories and Green Chemistry

  • Completed Spring 2014
  • Part of the £20 million phased redevelopment of the Department of Chemistry

King's Manor: Coat of arms restored

  • Completed Winter 2013
  • The coat of arms of Charles I

Awards:

  • York Design Award 2014
Artist impression of new refurbished kicthen

College accommodation refurbishment

  • Autumn 2013
  • James College Blocks A, B and C
Atmospheric Chemistry

Wolfson Atmospheric Chemistry Laboratories

  • Completed Summer 2013
  • The first dedicated laboratory building in the UK for atmospheric chemistry research
cycle track

All-weather cycle tracks

  • Completed May 2013
Awards:
  • Highly Commended RICS Tourism and Leisure 2014

Centre for Hyperpolarisation in MRI (CHyM)

 

Langwith College

  • September 2012
  • The new Langwith College development provides self-catered accommodation for 645 students.

York Sport Village

Awards:

  • LABC Best public service building: Highly Commended

Dorothy Hogkin building in Chemistry

  • July 2012
  • The second phase has doubled the size of the Dorothy Hodgkin Research building, completing our original vision.

Library expansion and refurbishment

  • March 2012
  • The £20m refurbishment of the library provides study facilities befitting a 21st century campus.

The new Library Cafe

  • February 2012
  • The Library Cafe combines catering, social and learning spaces.

YUSU development

  • Summer 2011
  • Extensive alteration has taken place to the old Students' Union buildings.

The Catalyst

  • February 2011
  • The Catalyst is designed to promote growth in the creative, IT, digital and media sectors

Ron Cooke Hub

  • November 2010
  • The Ron Cooke Hub is located on the lakeside and forms a landmark on Heslington East.

Department of Theatre, Film and Television

  • September 2010
  • A unique multi-disciplinary environment in which stage and screen are explored from various perspectives.

The York Law School
The York Management School

  • September 2010
  • The Law and Management Schools Building places two disciplines in a new, state-of-the-art building.

Church Lane

  • August 2010
  • A new road links Field Lane to Innovation Way in the Science Park.
Artist impression of new refurbished kicthen

Student accommodation refurbishment

  • Programme started summer 2010
  • A phased refurbishment of student accommodation across Heslington West.

Department of Computer Science

  • July 2010
  • In September 2010 the department moved to a brand new building on Heslington East.

Centre for Immunology and Infection

Goodricke College

  • September 2009
  • Goodricke College opened its doors to its first intake of students in October 2009.

Berrick Saul Building

  • August 2009
  • The £11m building houses the Humanities Research Centre and the Institute for Effective Education.
Heslington East masterplan

 

Campus development masterplan principles

  • A masterplan provides a structure and vision for a development such as Heslington East.