Wind Turbine Installation

A 15m tall 15KW Proven Energy Wind Turbine was installed at the Cape Verde Atmospheric Observatory in February 2009.  It was funded as part of SOLAS. The turbine is expected to consistently produce > 10KW of power assuming an average wind speed of 7 m/s (see plots below).  The power generated will contribute to half the site's electricity and so has major economical benefits for the Observatory  in addition to  increased environmental sustainability.  The turbine is expected to pay for itself within 2 years.  The sytem has yet to be integrated into the local grid and this is expected to happen within the next few months.

tower1    tower2    tower3
First part of tower in place                                                        Second part of tower in place                                                    Tower complete!

gin poles on      headon    end day 1
Gin poles on!                                                             Head on!                                                                                                       End of day 1!

blades on       electrics       winching 1
Blades on!                                                                                    Electrics                                                                                    James winching!

winching 2       overhalfway       erected
Katie winching!                                                                                           Over halfway!                                               

turbine from above


power curve        wind speed 30m

15KW manual